STATUS OF INFRASTRUCTURE IN JNV’S
 
I
Area of land  allotted (in acres)
Whether land transferred in the Name of Samiti
 
Vidyalaya shifted to permanent buildings on
30.3 Acres
 
 YES
 
 
July-1996
ii
Status of Boundary Wall
 a.  Brick Wall
b.  Barbed wire fencing
Completed
BRICK WALL (with Barbed wire fencing over it)
iii
Permanent buildings constructed
Yes (CBRI pattern)
iv
School building
 
 
 
Principal Office                    -1

Vice Principal Office           -1

Main Office                           -1

Store Room                          -1

Staff Room                            -1

Music Room                          -1

Art Room                               -1

Clinic Room                           -1

Class Rooms                         -12

Computer Lab.                     -1

Library                                   -1

Laboratories                         -4

v
Dormitories
Boys 480 in 2-tier system with
Warden Residence 02 No.
Girls 160 in 2-tier system with Warden Residence 02 No.
 
 
 
vi
Kitchen/dining Hall
 
 
No. of shifts required for all students  to take food
Kitchen-1
Dining Hall-2
 
ONE SHIFT
vii
Principal Residence
01   No.
viii
Staff Quarters
 
 
 
 
Type III = 28 Nos.
Type II = 01 Nos.
Type  I  = 12 Nos.
 SP Sheds converted into Staff Qrs.NIL
ix
M.P. Hall
Available
x
Workshop
Available
xi
Type of O.H. Tank
 
Its capacity
 
Present Status
 Column based
 
1,35,000 kilo Liters
 
 Working satisfactory
xii
U.G. tank
Its capacity
Present Status
 
1,40,000 Litres
Working satisfactory
xiii
D.G. Set
 
 
 
 
 

RO PLANTS
 
 
Available
KIRLOSKAR  make
Working
10KVA supplied by Samiti in 1996. 
 
 
 02
xiv
Sewage Pump
 Not available
xv
Water Pump
 
 
Total 06 water pumps  with  5HP Monoblock  open well = 3No’s ,3HP Submersible Motor=2No’s , 2HP single phase=1No’s , 1HP=1No’s  single phase capacities.
xvi
 Electrification
Electric connection
Sub Station building
Street lighting
 
Numbers of hrs. During day when power supply is available on an average.
 
 
Urban Feeder
Complete
Total No. of Poles = 80
 
Almost 24 hrs in a day except summer.
 
xvii
Playfields
 
400 meter track
40 x 30 meter basket ball court
40 x 30 meter volley ball court
 
 
 No (200 mtr. track available)
 2 Nos.  
 
2 Nos.  
 
xviii
Water supply
Tube Well
Hand pump
Connection from PHED
 
Not Potable,  01 Nos.- 
Potable, 04 Nos.-  working   
1hours supply in a day
xix
Rajeev Gandhi Smrithi Van
Available
xx
Fire fighting arrangement
 Working
xxi
Last date of cleaning of
(a)                      Septic tank
(b)                      Water tanks
 
 
 
xxii
Whether area around transformer is fenced
  Yes
xxiii
Whether open wells, if any, are covered from top
   Yes
xxiv
Works taken up under M&R fund during current year :-
 
Year
Name of work  (M&R)
Expenditure
(Rs. In Lacs)
Cumulative expenditure during the year
2008
Cleaning of OHT tanks 2450-00 2450-00
 
 
Cleaning of Water Sump 1450-00 3900-00
 
 
Internal white washing of dormitories 24247-00 28147-00
 
 
Internal white washing of old dining hall cum kitchen 2340-00 30487-00
 
 
Internal white washing of School building 16045-00 46532-00
 
 
Campus cleaning 6000-00 52532-00
 
 
Repairing of R.O.Plant 30000-00 82532-00
 
 
Internal white washing of HM & Staff Qtrs. 1854-00 84386-00
 
 
External colour washing of school building with Emulsion 132228-00 216614-00
 
 
Repairing of leakage from bathroom of staff qtr. 1000-00 217614-00
 
 
Admn. Bulding internal wall boarder painting
3908-00
221522-00
 
 
Campus cleaning (grass removal)
8880-00
230402-00
 
 
Repair & replacement of damaged doors at School building & dormitory.
6070-00
236472-00